Case Studies
Chesterfield College, Engineering Centre.

Location: Chesterfield College, Engineering Centre.
Client: Chesterfield College.
Finish: Polyester powder coat over Hot dip galvanized steel.

Project Overview:

A small entrance ramp handrail and wall rail installation.

Project Details:

This project was managed on a very tight deadline. After the rail had been galvanized we fettled and powder coated it in 2-days!  This ensured fitting was complete in time for the opening of the new college at the beginning of the academic year.

Attention to detail on the entrance balustrade to make sure there are no sharp edges to catch hands and clothing was required.

Benefits:

Not all projects need to be large to be important to us.

This small project needed close liaison with our galvanizer, a high quality and safety critical finish for a public area and delivery to a tight time-scale.